The subject of this paper is to present the
possibility of adapting the existing conventional steam
power station of TPP Bitola (Republic of North
Macedonia) in a plant using gas turbine combined
cycle (GTCC). The main emphasis is placed on the
energy analysis of the conceptual plant where the
required energy parameters of the individual
components of the combined cycle are shown. The
parameters of the superheated steam delivered by the
boiler in the current operating mode are considered
and they should be provided by heat recovery steam
generator with the heat of the exhaust gases from the
gas turbine to achieve a high degree of adjusted
upgrade of the thermal power plant. Simplified
schemes of the envisaged combined cycle consisting of
two gas turbines and one steam turbine are given. A
comparative analysis of the efficiency and capacity of
the existing and conceptual plant is performed.

Item Type: Article
Subjects: Scientific Fields (Frascati) > Engineering and Technology > Mechanical engineering
Divisions: Faculty of Technical Sciences
Depositing User: Prof. d-r. Sevde Stavreva
Date Deposited: 20 Feb 2023 11:18
Last Modified: 20 Feb 2023 11:18
URI: https://eprints.uklo.edu.mk/id/eprint/7687

Actions (login required)

View Item View Item