Mijakovski, Vladimir and Geramitcioski, Tale and Mitrevski, Vangelce (2016) TECHNO-ECONOMIC ANALYSIS OF THE RECONSTRUCTION OF CENTRAL HEATING SYSTEM IN THERMAL POWER PLANT BITOLA. In: International Conference "Power Plants 2016", 23-26 November 2016, Zlatibor, Serbia.
Text
E2016-059.pdf Download (1MB) |
Abstract
With the latest modernization and revitalization of blocks in Thermal Power Plant (TPP) Bitola (2010-2012), apart from increasing the power of each unit from 225 to 234,3 MWel, new regulating valves were installed in the section between Medium Pressure Turbine (MPH) and Low Pressure Turbine (LPT) enabling subtraction of steam for the purposes of district heating of Bitola. This also creates opportunity to connect power plant’s own central heating system, with installed heat capacity of approximately 26 MWh, to this heat source. This heating system is in operation for almost 35 years and the need for its revitalization and reconstruction, techno-economic analysis, investment costs, economic viability and return on investment period for the reconstruction are presented in this paper.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Additional Information: | ISBN 978-86-7877-024-1 |
Subjects: | Scientific Fields (Frascati) > Engineering and Technology > Mechanical engineering |
Divisions: | Faculty of Technical Sciences |
Depositing User: | Prof. d-r. Vladimir Mijakovski |
Date Deposited: | 02 Sep 2020 09:31 |
Last Modified: | 02 Sep 2020 09:31 |
URI: | https://eprints.uklo.edu.mk/id/eprint/5711 |
Actions (login required)
View Item |